How to Request Lot and Date-Code Evidence for a BOM Order

Nov 19, 2026

Leave a message

Jack
Jack
LC BOM editorial team
 

A date code and a lot identifier answer different questions on a BOM order. The buyer needs evidence that relates both fields to the exact manufacturer part number, physical packaging and quantities being supplied. Ask for that evidence before shipment, especially when material from different reels or lots will be used on one pilot build. It costs less time to resolve a mixed quantity while the parts can still be distinguished.

LC BOM lists digital integrated circuits as part of its sourcing range. The range includes a listing for STM 8-bit microcontrollers. That description is a useful category reference, while the full manufacturer part number, packaging suffix and approved sourcing requirements still belong on each RFQ line. For example, Texas Instruments' published guidance on product markings and labels describes its own Ship Trace Code area and date and lot information. This is a useful illustration of a manufacturer-specific scheme. Use the documentation and supplier confirmation applicable to the components being ordered.

Buy only the eligible quantity

Ask for the confirmed part and quantity by lot, date marking and physical package.

LC BOM STM 8-bit microcontroller product listing

LC BOM digital integrated circuit range

Write the requirement as a quantity decision

Put the complete manufacturer part number, including packaging suffix where relevant, on the RFQ. State which lines require lot or date evidence and whether more than one lot can be supplied. If the customer requires a date window, define what the window is measured against and what evidence you will accept. If an age restriction has commercial or process implications, get the person responsible for the assembly to approve that rule. A universal cutoff copied from another BOM can unnecessarily narrow supply.

For cut tape, partial reels or other quantities removed from the original packaging, explain what traceability must survive the repacking step. Ask how the supplier will associate the delivered packet with the source reel and label. If a customer requires manufacturer-sealed packaging for a particular line, put that condition on the order and keep it distinct from the date-code requirement.

Whether parts can be mixed affects the quote. Ask the supplier to show how many units can be delivered under each identified group. A single total does not tell the buyer whether the requested traceability conditions can be met.

Ask for label evidence with enough context

Request a readable image of the relevant manufacturer label and any outer or supplier label needed for identification. The label should show the fields needed for the order without unnecessarily exposing information belonging to an unrelated shipment. Record the exact part number presented and preserve leading zeros when transcribing date or lot fields. If an image shows only a close crop, ask for context demonstrating which package it represents.

The date code convention may vary by manufacturer and product. Use the maker's documentation or supplier confirmation for an unfamiliar code instead of assuming all four-digit strings follow the same calendar rule. Keep a field for the exact transcription and one for an interpreted date only when verified. Do the same for a lot code and any trace identifier that combines several fields.

Photos document observed marking. They do not independently establish authenticity or an unbroken chain of custody. For higher-risk purchases, apply the additional supplier qualification, documentation and inspection requirements the organization already uses. Keep those decisions on their own lines.

Use the component lot and date-code evidence to create an approval that travels with the BOM line. A short record might show the full MPN, exact date marking, corresponding lot identifier, approved quantity and packaging. Keep a pointer to the supplier images and update the quantity when a partial reel is issued. If the status changes, show when it changed and which approver authorized the decision. Keep original markings as observed so a downstream assembler can compare the recorded field against the label without reverse-engineering a warehouse abbreviation. A precise cross-reference can save a day of work during a field investigation.

Match the evidence to the purchase-order split

Item Request in the RFQ Reconcile at receiving
Manufacturer identity Complete MPN, package and supply format Compare the labeled identity to the approved PO line
Lot and date code Exact codes, label location and quantities by group Verify each group and note any documented exceptions
Partial quantity How it remains traceable to the source pack Match the cut tape or partial reel to the associated record
Commercial approval Single or mixed lots, date window and exception owner Hold any group outside the agreed conditions
Production issue Which identifiers the assembler needs Preserve the link through pick, issue or return

Consider an illustrative 2,400-piece line item. A supplier offers 1,800 pieces from one documented group and 600 from another. If the order permits mixing and both groups satisfy the date and evidence rules, the buyer can accept that split and require separate identification. If the customer requires a single lot, 2,400 available does not mean 2,400 eligible. Ask whether the compliant quantity is sufficient for the intended build before authorizing a revised delivery.

On a limited pilot, engineering might approve a designated lot for only part of the order. Translate that exception into expected quantities on the PO and receiving instruction. If the cleared group is shipped in several packages, label records should support that breakdown.

Check the physical receipt and the production handover

Compare the quotation, acknowledgment, label evidence and delivered package. Save receiving photos and log the observed code, package status and quantity. If the group differs, explain which parts are affected and hold them under the agreed process. Where the supplier corrects a document, keep the first version and explain how the revised document relates to the physical evidence.

Transfer the group identification into the stock location or material issue record as needed. When several reels move to the assembly line, distinguish labels the operator can read from full background records held by quality. A return-to-stock procedure should preserve the association for partial packages.

Keep inventory, acceptance and run history available separately. Months later, a quality engineer might need to find every build that used a group. The buyer can help by agreeing which record remains attached to the group from the moment it is dispatched. That discipline also reduces unnecessary holds when only one group is affected.

During pre-shipment review, name the person authorized to accept different packaging or a mixed group on the buyer's side. If two purchase lines contain the same MPN but go to customers with different date-code rules, a technically suitable component can still be commercially unsuitable for one shipment. Record which customer order each approved group serves and keep that assignment with the received stock until issue.

A helpful evidence record also gives the buyer enough information to resolve a shortage without reworking every line on the order. For example, the total quantity might be right while a required date group is short by one partial pack. The warehouse can clear eligible groups under the approved process and identify exactly which quantity remains in question. Send that shortfall back to purchasing with the recorded label and reserve an identifiable storage location for the discrepancy.

For repeat buys, compare the new quote against the previous order before copying the code interpretation. Product marking practices or packaging may change. Ask the source to identify any relevant change and update the check sheet when the answer is confirmed. Keep previous label records linked to the earlier receipt, so the next review can distinguish a new packaging arrangement from a traceability gap.

If the supplier offers an unmarked bag of cut tape alongside marked originals, decide what evidence is needed for that partial shipment before agreeing to buy it. Someone in receiving should be able to identify the bag's source group and quantity without breaking unnecessary seals or relying on a handwritten description alone. Resolve that requirement in the order and use it during physical intake.

BOM receiving questions

Is the date code enough to identify a manufacturer lot?

Record the applicable lot or trace field separately and confirm how the manufacturer relates the two. A printed date alone may describe a period shared by several production groups. Ask for a documented interpretation if labels are unclear.

Can a label photo be accepted before purchase?

It supports the quote when linked to the exact package and quantity. Ask the supplier to identify the offered group and preserve the relationship when it ships. Verify the actual receipt under the organization's process.

What should the buyer request for cut tape?

Request a clear link to the source packing identity, partial quantity and the associated label evidence. Ask how the package will be identified so incoming inspection can reproduce the match. Apply the customer's packaging policy if it imposes stricter requirements.

Can one purchase-order line include multiple dates?

Only if the order and customer acceptance requirements permit it. Ask for the quantity and identity of each group, including dates and lots. Keep separate traceability through receiving and issue.

Who should approve a code outside the agreed window?

Route it to the designated approver and include application, code evidence, affected quantities and reason for the exception. Keep the parts in the specified hold status until the decision is recorded.

Does a clear label prove component authenticity?

It helps identify the observed package and supports traceability review. Apply the organization's sourcing controls and required inspections as separate evidence. Retain originals when a discrepancy requires further investigation.

Request a documented BOM quotation

Send LC BOM the manufacturer part numbers, quantities, packaging needs, date or lot terms, and whether split groups are permitted. Ask for an evidence and quantity breakdown by each offered group.

Contact LC BOM

Send Inquiry