COMPONENT PURCHASING
The package code on a component order describes a physical form or an ordering option tied to it. The packing code identifies how the exact component will be supplied, such as tape and reel or tray where the manufacturer offers these options. Require the complete orderable code and manufacturer documentation. These suffixes are manufacturer-specific, and the same letters can have different meanings across part families.
LC BOM's digital IC catalogue includes package descriptions for particular products. For a real order, read the original manufacturer's part-number and packing tables for the exact device. Make the assembly document and purchase order identify the same variant. A buyer can receive the right functional part but the wrong footprint or a form of packing that the line cannot use.
Match the physical package, supplied packing and exact orderable identity before release.

View the related product or series · Compare the second product or supplier reference
Read a component package vs packing code on the order
Start with the design part number, land pattern, body size, terminals and assembly orientation. Compare the manufacturer's mechanical drawing and variant description. If the engineering team has approved another option, record it as an alternate with its own evidence. Avoid replacing pin or footprint details with a generalized package label. A similar body shape is not enough to infer interchangeability.
Ask production which reel, tray, orientation or other packing arrangement can be used for the current line and batch size. If a distributor offers cut tape or repacking, ask exactly what it will supply and whether the intended process and traceability requirements permit it. Keep original manufacturer packaging and a supplier repack identifiable. For small prototype quantities, the answer may differ from that for volume assembly.
| Order detail | Document it using | Receiving check |
|---|---|---|
| Device and package | Exact manufacturer ordering code and current drawing | Match item and footprint reference |
| Packing | Manufacturer or approved supplier packaging details | Verify format and count |
| Condition and labeling | Approved marking, lot and handling information | Preserve identity and inspection history |
| Substitution | Engineering release and exact offered code | Stop unresolved changes before issue |
Read a hypothetical mismatch in both directions
Suppose an approved part arrives in a tray while the automated line expects an approved reel. The footprint might still be correct but the material may not be ready for that assembly process. Record the packaging deviation and ask the authorized owner what is allowed. Conversely, a correctly sized reel can carry a different package. Verify label identity against the approved BOM before putting it into production stock.
For suppliers, a quotation should list the exact part and packing independently with quantity basis and packing increment. Ask them to identify broken packs and any traceability differences. The buyer can then compare what each offer actually delivers without assuming that an abbreviated part string describes both variables. This matters when a line must re-order after a supplier change.
Use one record at quote, receipt and kitting
Keep the approved device, package and packing evidence on the purchasing item. Record any deviations and responsible reviewers. The warehouse should know which incoming references to match, while production should know how preparation is governed. Do not count an unresolved item as ready for a build. Keep the response to any repacking request and technical approval with the exact lot.
Make the part-number table part of the order
Attach the original manufacturer's documentation for the exact device and include the revision or retrieved evidence as required. A packing table and drawing can be separate documents, even where both choices appear in the last characters of an order code. Place the approved device, package and packing on the quotation line in separate fields. This separates a difference in physical fit from a difference in how stores will issue the material.
Check that the pricing line is based on the same units. One vendor may quote a full reel or tray, another may offer a cut quantity. Ask for the quantity being sold, pack increment and condition under which it is supplied. If traceability affects selection, ask how the lot and original manufacturer are identified and what records travel with a repack. A low unit price can require a different process or a different receiving check. The comparison becomes more meaningful when purchasing records those requirements before reviewing cost.
Some components have several package options listed under one functional family. Select using the engineering-approved code rather than a catalogue title. If the proposed form is unclear, obtain the released package drawing and compare it with the assembly reference. Do not assume that apparently equivalent electrical descriptions identify the same terminals, body or orientation. Put changes in an approved alternate record rather than giving receiving two indistinguishable identities.
Read the proposed pack as a production input
Bring production into the discussion before approving an exception. The quantity may be suitable for hand assembly and unsuitable for the scheduled automatic line. Ask which approved process can use the offered format, and whether a distributor pack changes identification or handling. If a change is accepted, state who will prepare or approve the material and where it will be stored. Some pilot orders willingly accept managed alternatives, but those approvals must not become a default for bulk.
Request exact packing information that the line needs. Relevant evidence can include format, orientation, feeder requirements, pack quantity and label. Where an authorized process requires handling evidence, check what the vendor can provide for the exact item and shipment. A similarly sized reel may contain components presented differently. A line owner should be able to recognize the appropriate documentation without needing the original requester to explain the quote.
Consider a manufacturer selling a part in two approved packing options. If the buyer requests only the base device code and the vendor fills the missing suffix, the part may fit while the packing still disrupts the intended workflow. Keep the vendor's assumed option visible until it is accepted. If the supplier cannot provide the approved original pack, request a separate comparison and review any quantity, timing or extra preparation effect before ordering.
Give receiving an approved exception path
At receiving, verify order identity, condition and packing details against the applicable documents. Preserve the actual label when an item arrives in a different configuration and record who reviews the change. Do not reformat the paperwork to make the delivered item look equivalent to the original request. A corrected purchase line or approved deviation should retain enough history to show the decision clearly. The production planner needs to know when a line goes from arrived to accepted.
Keep incomplete shipments in their actual commercial status. If only one pack arrives and the rest is delayed, confirm which quantities can support the build without loosening any packing or technical constraints. The packing worksheet can account for opened and accepted materials separately from pending deliveries. Ask the supplier to identify which of the remaining goods matches the approved packing requirement.
For a follow-on order, reuse the confirmed exact strings and documentary references. If the component manufacturer changes either packing or physical package information, record the affected scope and ask the proper reviewers which evidence needs renewal. This helps prevent a seemingly minor suffix from changing the configuration that actually reaches the line.
If the intended purchase supports both a lab build and factory assembly, ask whether they should use separate lines. A lab may accept an approved small quantity in a form the production feeder was not designed to use. A procurement request that combines them should still make the lot, physical package and packing decisions explicit. On arrival, record the condition and which use the released quantity supports. If one line changes, calculate which group is affected before committing stock. Ask the supplier for the exact documentation and how it identifies a remaining quantity in an opened or separately packed item, if relevant and permitted. In the released quote, use the actual manufacturer identity plus the supplier's agreed packing terms. Preserve how any substitute entered the decision. Manufacturing and quality should see the same information procurement saw, especially if a different packing presentation needs a special approved preparation. When a supplier updates the option table, ask whether existing orders or material still match the confirmed item. Update the affected document with a date, owner and scope. This lets the buyer explain why a specific delivered option was accepted and what must happen before it goes to the intended line. Keep unresolved quantities out of available stock until the applicable review is complete.
Questions before issuing a component PO
Can a distributor suffix replace manufacturer verification?
Ask for the original orderable reference and any separate supplier packing option.
Is reel always required?
Use the approved process and quantity. Requirements can differ across assembly and prototype work.
Can two packages have identical part behavior?
They may share some functional characteristics. Check the exact drawing and applicable evidence before approving a substitution.
What if the order only lists a shortened code?
Ask for a corrected complete line and approval before releasing the purchase.
Is packing quantity the order quantity?
Show packing increment, ordered quantity and delivered count separately.
What does LC BOM need to quote?
Provide exact manufacturer codes, approved packages, pack formats, quantities and traceability requirements.
Request an itemized component quote
Send LC BOM the released BOM and production packing requirements. Ask for the exact offered codes, quantity basis and any deviation in writing.

